Design and Implementation of a Drum-Buffer-Rope Pull-System

Thumbnail
View/open
Author's post-print (1.370Mb)
Author
Darlington, John
Francis, Mark
Found, Pauline
Thomas, Andrew J.
Date
2015
Type
Article
Publisher
Taylor & Francis Group
Metadata
Show full item record
Abstract
Purpose: This paper investigates the selection, design and implementation of a Drum-Buffer-Rope (DBR) type of production pull-system in a panel fabrication plant characterised by extensive shared, batch resource resources within a low volume UK manufacturer of large vehicles. This was the second of a series of two related research projects conducted under the aegis of a Lean initiative at this case firm. Design/methodology/approach: A purposively selected longitudinal case study conducted over 24 months and organised around a two phase research design. The initial body of evidence included a detailed map constructed by a project team of eight managers and accountants during a two day structured workshop; numerous unstructured interviews and observation of shop floor practices; document and archival analysis, and 140 photographs of the focal operation. Supplemented by extensive financial and operational data extracted from the firm’s accounting and MRP systems, including all data necessary to construct and implement bespoke capacity planning, work in progress (WIP) monitoring and simulation modelling tools. The case firm is anonymised. Findings: The Lean manufacturing literature ignores the real-world issue of shared resources, and this gap is attributable to the concept of ‘rightsizing’ tools and equipment that is widely promoted within the Lean community. The case panel plant is characterised by extensive shared resources; many of which are also batch processes. The most appropriate pull-system method for this production environment is DBR. The detailed design of the DBR mechanism required a controlled transfer buffer of overhead conveyance capacity after the Drum because the extent of downstream process variability risked it being unable to offload panels, hence compromising throughput. Research limitations/implications: The study is based upon a single case. This consequently has implications for the ability to generalise from the results. Practical Implications: When the DBR pull-system design was implemented it reduced the number of panels in WIP by 60%. This equated to a 56% (18 days worth) reduction of manufacturing lead time and more than doubled the plant’s inventory turns (from 9.1 to 21.2). It also significantly improved delivery schedule adherence, with downstream jig stoppages in the Final Assembly falling from an average of six to less than one per week. The financial benefit was independently audited to equate to an annualised value of $850 K. Consequently, this project was awarded the first prize at its parent enterprise’s annual worldwide process improvement competition. Originality/value: This paper details a novel technique that permits the routings of multiple value streams to be mapped and is useful for highlighting the identity and location of shared resources. It also contributes significantly to the literature that is available on the relationship between the Lean paradigm and the management of shared production resources, and adds to the literature on the detailed design and implementation of a DBR pull-system in a jobbing-type of environment.
Journal/conference proceeding
Production Planning & Control: The Management of Operations
Citation
Darlington, J., Francis, M., Found, P. and Thomas, A.J (2015) 'Design and Implementation of a Drum-Buffer-Rope Pull-System', Production Planning & Control: The Management of Operations, Vol. 26, No. 6, pp.489-504
URI
http://hdl.handle.net/10369/7562
DOI
http://dx.doi.org/10.1080/09537287.2014.926409
Description
This is an Accepted Manuscript of an article published by Taylor & Francis in Production Planning & Control: The Management of Operations on 11 June 2014 (online), available at: http://dx.doi.org/10.1080/09537287.2014.926409
Collections
  • Welsh Centre for Business and Management Research [218]

Related items

Showing items related by title, author, subject and abstract.

  • Thumbnail

    Enhancing the design capabilities of small and medium-sized enterprises through knowledge transfer 

    Millward, Huw; Byrne, C.; Lewis, Alan (Taylor & Francis, 2006-05-01)
    This research was based on the analysis of 12 PDR-based Knowledge Transfer Partnerships (KTP). PDR employs KTPs as an effective mechanism for collaborative design and development, particularly small and medium-sized ...
  • Thumbnail

    Developing a Travel Blog System to aid Travellers in Sharing their Journeys 

    Atkinson, Thomas (Cardiff Metropolitan University, 2014)
    Abstract – Thomas Atkinson The aim of the project was to create a system that enabled travellers to share photos taken on a smart phone with other people like family and friends. The Author has followed the rapid ...
  • Thumbnail

    Investigating Technology User Acceptance of Virtual Learning Environments in Higher Education Institutions in Qatar 

    AlMohannadi, Abdulaziz (Cardiff Metropolitan University, 2016-04)
    o ABSTRACT Since the rapid growth and development in technology, specifically in the Internet followed by the popular attitude pertaining to using computers and technology, this resulted in the birth of new gadgets and ...

Browse

DSpace at Cardiff MetCommunities & CollectionsBy issue dateAuthorsTitlesSubjectsThis collectionBy issue dateAuthorsTitlesSubjects

My Account

Login

Statistics

Most Popular ItemsStatistics by CountryMost Popular Authors

DSpace software copyright © 2002-2015  DuraSpace
Contact us | Send feedback | Administrator